Burn Building:
The burn
building is a 2 story large residential type structure that
allows for many evolutions on both floors as well as a basement
that can make the building simulate 3 stories. We use a
combination of Class A materials (straw and pallets) and a state
of the art Symtron propane fired burn simulator that includes a
multi operational flashover simulator. The building features
full interior and exterior stairways, block and concrete
construction, multiple ventilation fans, chop out doors hinged
on heavy duty steel, heavy duty steel windows, dry pipe
standpipe system on each floor, hydrants front and rear with a
FDC in place.
Tower
Building:
The tower
building is a 4 story high rise training tower that has many
unique props. The building has a completely enclosed interior
stairwell with the ability to close off each floor separately to
enhance ventilation training. The first floor features 3
entanglement drills, and a Denver drill. The second floor
feature a garden apartment style multi use stud wall layout. The
walls are pinned and can be moved to change the floor plan.
Also, an attic simulator is in place. This floor is attractive
to fire, EMS and law enforcement due to it’s flexibility. The
second floor also features an exterior balcony on the outside of
the building. The third floor features a large open space to be
customized by the user depending on their needs. The fourth
floor features the same open space as well as a full stair to
access the roof.
The roof
features multi point anchor and tie offs to allow for rappelling
from any and all sides. Also featured is a parapet wall around
the roof to enhance the rappel or the basket rescue…..however,
new rescuers never fear we also have a walkout area to allow for
the rappel without the parapet being used.
The Roof
features a hatch that simulates a confined space that extends
through all floors down to the ground level. The drills can
utilize each floor separately or go the whole way down. Between
the second and third floors there is a steel pipe simulator that
gives the effect of a well of confined space.
The tower
building also features a wet standpipe system with connection on
each floor.
Classroom
Building:
The classroom
building is a multi purpose training area that features 4 large
classrooms that accommodate up to 40 people, 4 staff offices,
restrooms, break room, instructor library as well as multiple
storage areas. The classrooms all have wireless technology
capability, LCD projectors that are ceiling mounted, DVD and VHS
players in place.
Draft
Tank
The draft tank
is a 28,500 gallon underground static tank that is used for
service testing pumps. The draft site allows for drafting from
either side or both for larger GPM flows. The tank, when empty
also serves as an excellent confined space training prop. Safety
railing is in place on all sides to enhance safety.
Rescue
Technician Structural Collapse:
This is our
newest addition to the ETC. A fully functional RT structural
collapse training course with the full O course, above ground
and below ground mazes for collapse or confined space, air bag
lift station, metal cutting station, horizontal and vertical
concrete breaking and breeching stations, and many other
features.
Burn
Pits:
This area is
used for burning vehicles and pallets for live fire training as
well as fire extinguisher training areas. We have a forklift
fire, vehicle fire and extinguisher fire station in place at
this time.
Other
training areas:
There are many
other areas of the site that are used for training such as a
hazardous materials damming and diking area, roof ventilation
simulator, and others. If you have a particular need call us so
we can design areas that will accommodate your needs.